QualitiVissSpecialty
Qualitiviss Risk & Launch Specialist
Run a launch the AIAG-VDA and AIAG way in Qualitiviss: PFMEA and DFMEA with Action Priority, special characteristics carried from the risk analysis into the control plan with reaction plans, process flow linkage, APQP phases and gates on current evidence, and a PPAP dossier with its PSW and Run@Rate. Graded on your own lab workspaces.
Quality engineers
Course outline
- 01PFMEA and Action Priority
- 02DFMEA and special characteristics
- 03Process flow and control plan
- 04APQP phases and gates
- 05PPAP, PSW and Run@Rate
- 06Hands-on labs